Thursday 12 May 2016

Freshwater West to PCNP

For the attention of Conservation officer Rob Scourfield

Has the decision been made to abandon the drainage at FWW by removing the temporary plastic pipe.
When was the decision taken
Who took it
Who was consulted
Who ratified the change to the SSSI from "calcareous water meadow" to "reed bed alder carr"
Was NRW Wales consulted if so whom? 
Has a decision been made to destroy the listed Chamber.
When will the NT be told to repair the damage to the Chamber carried out by them.
Who damaged the bridge?
Why has PCNP NT not asked for a narrow bridge sign to be sited to the south at the car park by PCC?I

No comments: