Thursday 27 March 2014

Pembroke Barrage ALL WORK MUST CEASE

 Showing the spoil blocking the navigable channel
The gate which has design faults and has failed so many times in the past is being replaced at our expense  It will never work
All engineers I have spoken to are agreed that the design is flawed and a waste of money, modifications ie locks on the gates to the footbridge are cosmetic. To navigate three weeks notice must be given,totally illegal.

No comments: